Telecommunications

In the data center building (Kurenivskaya, 21A) there are 2 cable entries for fiber-optic channels of different sizes (number of fibers)
Inseting into the existing fiber can be directly closeness to the building (no more than 500 meters) and at any point in the presence of cable route (if technically possible)
In the area of st. Kurenivsko 21A - "the last mile" can be arranged at the points:
- alley Kurenivsko, 15 (TC № 1416)
- crossing streets Sklyarenko and M. Vovchka - № TC 241, № 1276 TC

Switching time - up to 20 working days (depends on the weather conditions, agreements with Ukrtelecom and force majeure factors - each of these factors can increase the time of inclusion)
All questions of switching are considered in each case individually. Switching, which do not require installation of additional cable routes, inserting into existing cables - usually performed within 2-3 days
The main telecommunication centers in Kiev, where the direct switching can be made by active equipment are:
- str. Leontovich, 9,
- str. Dorogozhytska 10 (TV tower)
- str. Gaidar, 50
The main advantages of telecommunication connections scheme of the data center are:
- reservation key inputs ("last mile")
- a large number of fibers (96) - sale, lease
- guaranteed speed and quality of data
- the possibility of organizing a permanent connection to the Internet
- information security from unauthorized access
- minimum cost of exploitation
These services may be provided to corporate customers, service providers, and telecom operators